Electrical thumb rules for selecting various electrical equipment

Here are some electrical thumb rules for selecting various electrical equipment:

Power Cable Selection:-

1.⁠ ⁠Voltage drop: 3% for feeders, 5% for branch circuits

2.⁠ ⁠Current carrying capacity: 1.5-2 times full load current

3.⁠ ⁠Cable size: 1.5-2.5 mm²/kW for 3-phase, 1-2 mm²/kW for 1-phase

4.⁠ ⁠Cable insulation: 600V/1000V for LT, 6.6kV/11kV for HT

Earthing Cable Selection:

1.⁠ ⁠Earth fault current: 10-20 times full load current

2.⁠ ⁠Earthing cable size: 1/2 to 2/3 of phase conductor size

3.⁠ ⁠Earth resistance: ≤ 1 ohm for LT, ≤ 5 ohms for HT

Motor Selection:

1.⁠ ⁠Motor size: 1.5-2 times load HP/kW

2.⁠ ⁠Motor efficiency: ≥ 90% for IE2, ≥ 95% for IE3

3.⁠ ⁠Power factor: ≥ 0.8 for induction motors4.⁠ ⁠Starting current: 6-8 times full load current

Generator Selection:

1.⁠ ⁠Generator size: 1.5-2 times load kVA/kW

2.⁠ ⁠Generator efficiency: ≥ 90%

3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Frequency: 50/60 Hz

Transformer Selection:-

1.⁠ ⁠Transformer size: 1.5-2 times load kVA

2.⁠ ⁠Efficiency: ≥ 95% for distribution, ≥ 98% for power transformers

3.⁠ ⁠Voltage regulation: ≤ 4%

4.⁠ ⁠Insulation level: 600V/1000V for LT, 6.6kV/11kV for HT

UPS Selection:-

1.⁠ ⁠UPS size: 1.5-2 times load kVA/kW

2.⁠ ⁠Efficiency: ≥ 95%3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Backup time: 15-60 minutes

Inverter Selection:-

1.⁠ ⁠Inverter size: 1.5-2 times load kW

2.⁠ ⁠Efficiency: ≥ 95%3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Frequency: 50/60 Hz

Other Equipment Selection:-

1.⁠ ⁠Circuit Breaker (CB): 1.5-2 times full load current

2.⁠ ⁠Contactors: 1.5-2 times full load current

3.⁠ ⁠Relays: 1-2 times full load current

4.⁠ ⁠Fuses: 1.5-2 times full load current

General Thumb Rules:-

1.⁠ ⁠Derating: 20-30% for temperature, 10-20% for altitude

2.⁠ ⁠Overloading: 10-20% for motors, 5-10% for transformers

3.⁠ ⁠Efficiency: prioritize high efficiency equipment

4.⁠ ⁠Redundancy: consider N+1 redundancy for critical systems

Note: These thumb rules serve as guidelines and may vary depending on specific application, industry standards, and local regulations.