Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the morenews domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jobsdqct/eeediary.com/wp-includes/functions.php on line 6121
Electrical thumb rules for selecting various electrical equipment - eeediary.com
Site icon eeediary.com

Electrical thumb rules for selecting various electrical equipment

Here are some electrical thumb rules for selecting various electrical equipment:

Power Cable Selection:-

1.⁠ ⁠Voltage drop: 3% for feeders, 5% for branch circuits

2.⁠ ⁠Current carrying capacity: 1.5-2 times full load current

3.⁠ ⁠Cable size: 1.5-2.5 mm²/kW for 3-phase, 1-2 mm²/kW for 1-phase

4.⁠ ⁠Cable insulation: 600V/1000V for LT, 6.6kV/11kV for HT

Earthing Cable Selection:

1.⁠ ⁠Earth fault current: 10-20 times full load current

2.⁠ ⁠Earthing cable size: 1/2 to 2/3 of phase conductor size

3.⁠ ⁠Earth resistance: ≤ 1 ohm for LT, ≤ 5 ohms for HT

Motor Selection:

1.⁠ ⁠Motor size: 1.5-2 times load HP/kW

2.⁠ ⁠Motor efficiency: ≥ 90% for IE2, ≥ 95% for IE3

3.⁠ ⁠Power factor: ≥ 0.8 for induction motors4.⁠ ⁠Starting current: 6-8 times full load current

Generator Selection:

1.⁠ ⁠Generator size: 1.5-2 times load kVA/kW

2.⁠ ⁠Generator efficiency: ≥ 90%

3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Frequency: 50/60 Hz

Transformer Selection:-

1.⁠ ⁠Transformer size: 1.5-2 times load kVA

2.⁠ ⁠Efficiency: ≥ 95% for distribution, ≥ 98% for power transformers

3.⁠ ⁠Voltage regulation: ≤ 4%

4.⁠ ⁠Insulation level: 600V/1000V for LT, 6.6kV/11kV for HT

UPS Selection:-

1.⁠ ⁠UPS size: 1.5-2 times load kVA/kW

2.⁠ ⁠Efficiency: ≥ 95%3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Backup time: 15-60 minutes

Inverter Selection:-

1.⁠ ⁠Inverter size: 1.5-2 times load kW

2.⁠ ⁠Efficiency: ≥ 95%3.⁠ ⁠Power factor: ≥ 0.84.⁠ ⁠Frequency: 50/60 Hz

Other Equipment Selection:-

1.⁠ ⁠Circuit Breaker (CB): 1.5-2 times full load current

2.⁠ ⁠Contactors: 1.5-2 times full load current

3.⁠ ⁠Relays: 1-2 times full load current

4.⁠ ⁠Fuses: 1.5-2 times full load current

General Thumb Rules:-

1.⁠ ⁠Derating: 20-30% for temperature, 10-20% for altitude

2.⁠ ⁠Overloading: 10-20% for motors, 5-10% for transformers

3.⁠ ⁠Efficiency: prioritize high efficiency equipment

4.⁠ ⁠Redundancy: consider N+1 redundancy for critical systems

Note: These thumb rules serve as guidelines and may vary depending on specific application, industry standards, and local regulations.