Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the morenews domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jobsdqct/eeediary.com/wp-includes/functions.php on line 6121
How to inspect Main chiller Control Panel inspection? - eeediary.com
Site icon eeediary.com

How to inspect Main chiller Control Panel inspection?

Main chiller Control Panel inspection.

1. Visual inspection
– Extenders for bus ducts are as per the project specifications.
– Required numbers of extenders are fixed as per the cable details of signal line diagram
– Mounting bracket / spare fuses/ panel keys/ pocket are provided
– panel board is cleaned
– Cable numbers, terminal numbers, and terminal bar labels are as per the control circuit diagram.
– Name plate “ tested and quality passed” and “KIK logo” pasting on the main door

2. Mechanical inspection
– All manually operated components are properly functioning
– All mechanical interlocks are properly functioning
– cable supports / ducts and connections are in place
– Clearance and creepage distance are maintained as per the IEC 614339-1
– All terminals and joints are tightened to the correct torque and marked where required
– Busbar dimensions and supports are as specified
– Power and control cables are properly and neatly laid

3. Electrical Inspection
– Panel board complies with project specifications
– ACB/MCCB settings are as per the design output documents
– Terminal overload relays are selected according to the rated current of the motor
– Timer setting are set as specified
– Types and ratings of fuses, contactors, overloads etc.. area as specified
– Cross section of conductors are complied to KIK panel assembly guidelines
– Arramgemet of bus bars as per the design
– Extenders sizes of incoming and outgoing of phases, neutrals and earths are as per the design
– Power wiring of surge arrestors are checked against manufacturer’s specifications
– Insulation resistance test (500 V/ 1000 V)