Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the morenews domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jobsdqct/eeediary.com/wp-includes/functions.php on line 6121
What to consider in a Solar Project? - eeediary.com
Site icon eeediary.com

What to consider in a Solar Project?

For evaluating a solar project you need to consider few types of detail . for that we present you a finished a project detail we collect after completion.

Project Highlights:-


*Total Solar PV Panels: 2,274
*Inverters Used: 9
*Panel Module: JA Solar JAM72S30-550/MR
*Module Electrical Parameters at STC:
*Open Circuit Voltage (Voc): 49.9Vdc
*Maximum Power Voltage (Vmp): 41.96Vdc
*Maximum Power Current (Imp): 13.11A
*Module Efficiency (η): 21.3%
*Maximum System Voltage: 1000/1500Vdc
*Maximum Series Fuse Rating: 25A
*Inverter Module: SUN2000-100KTL
*Maximum Input Voltage: 1100V
*Operating Voltage Range: 200-1000V
*Maximum Efficiency: 98.6% (415V)
*Full Load MPPT Voltage Range: 540-800V (380V/400V)
*Maximum Short Circuit Current per MPPT: 40A
*Number of Inputs: 20
*Number of MPPT Trackers: 10
*Maximum Apparent Power: 110kVA
*Maximum Output Current: 160.4A (400V)
*Maximum Total Harmonic Distortion: <3%


*System Design:
·       Maximum PV Modules per String: 21
·       Maximum String Open Circuit Voltage: 49.9 * 21 = 1047.9V (within 1100Vdc max limit)
·       Maximum String Operating Voltage: 41.96 * 21 = 881.16V (within 200-1000Vdc operating range)
·       Solar Array Current: 13.11 * 2 = 26.22A (within the 40A max withstand current per MPPT)
·       Average Daily Power Generation: 600kWh * 9 = 5,400 kWh
This installation operates under the Net Accounting category, feeding excess generation back into the national grid. If PV generation is insufficient and consumption exceeds generation, the national grid supplies power to the factory. At the end of the month, if the PV generation exceeds consumption, the grid supplier compensates for the excess units. Otherwise, the factory pays for the additional power used. This power transition occurs through the common coupling point.
The client’s primary goal is to significantly reduce electricity costs, and this project does not include a battery backup system.
This project stands as a testament to the potential of renewable energy in driving cost savings and environmental impact.